Dammam’s 3rd industrial city ready

The head of the Saudi Industrial Property Authority (Modon) has said the 3rd industrial city is ready to receive 100 factories, Al-Eqtisadiah daily reported.

July 31, 2014

 


 


DAMMAM — The head of the Saudi Industrial Property Authority (Modon) has said the 3rd industrial city is ready to receive 100 factories, Al-Eqtisadiah daily reported.


 


Saleh Al-Rasheed said the city covers a 12 million square-meter area and will receive factories from the first industrial city that cause environmental pollution. 


 


He noted that there is no set period for the relocation of these factories from the first city to the third, but there are some factories that have already been advised to relocate.


 


He pointed out the city includes a power station that is capable of producing 500 megawatts of electricity, in addition to a water desalination plant, and the necessary infrastructure. — SG


July 31, 2014
HIGHLIGHTS
SAUDI ARABIA
7 hours ago

Interior minister launches 911 operations center in Madinah

SAUDI ARABIA
8 hours ago

African national arrested for transporting 4 women expats to Makkah without a Hajj permit

SAUDI ARABIA
8 hours ago

Roads General Authority: Road network fully prepared to serve Hajj pilgrims